Post by missiontrails on Sept 15, 2021 8:57:57 GMT -8
|
|
|
Post by jp92grad on Sept 15, 2021 12:16:36 GMT -8
|
|
|
Post by missiontrails on Sept 15, 2021 17:16:37 GMT -8
Better than nuttin'. Thanks!
|
|
|
Post by jp92grad on Sept 15, 2021 17:59:40 GMT -8
If you look right now (7pm) you can see on the live cam that they flew the last backstop in the southwest corner and are use another crane to hold it in place (see it using the still cam)
I guess it's better then nothing!
|
|
|
Post by Old School on Sept 15, 2021 18:47:35 GMT -8
Oldie Out
|
|
|
Post by aztecfred on Sept 17, 2021 17:16:54 GMT -8
Actually caught crane workin.
|
|
|
Post by jp92grad on Sept 20, 2021 6:23:20 GMT -8
Can somebody get a current (9/20) photo of the interior southwest corner and post it here?
I think many here would really enjoy it!
|
|
|
Post by aztecfred on Sept 20, 2021 8:36:16 GMT -8
A new up to date drone shot would be awesome, if the FAA doesn't ban them.
|
|
|
Post by Old School on Sept 21, 2021 19:54:31 GMT -8
Oldie Out
|
|
|
Post by Old School on Sept 22, 2021 13:15:20 GMT -8
Oldie Out
|
|
|
Post by sleepy on Sept 23, 2021 8:32:39 GMT -8
Can anybody tell what they are breaking out of the big styrofoam boxes on the lower level this morning (9:30 am)? Seems like maybe they are installing something on the top row, lower level.
|
|
|
Post by jp92grad on Sept 23, 2021 9:40:17 GMT -8
Can anybody tell what they are breaking out of the big styrofoam boxes on the lower level this morning (9:30 am)? Seems like maybe they are installing something on the top row, lower level. More then likely insulation over the concrete to install some type of other flooring system. This will allow them to control the temp in these suites/areas much better. Or they could be just filling space behind those PreCast panels, prior to setting up finish grade for the flooring??? Or they could be building a giant cooler for all kegs for the 25 cent beer nights ( childhood flash backs!) All info is just a guess after having stayed at a Holiday Inn last night* *hope it was correct reference
|
|
|
Post by aztecfred on Sept 23, 2021 18:15:34 GMT -8
Watching them set a few pieces and noticed they got some serious scoffing goin on around northerly scoreboard. Have no idea about south scoreboard?
|
|
|
Post by sdsu2000 on Sept 26, 2021 11:36:59 GMT -8
It appears they could be done with placing all the concrete on the west side this coming week. Wonder if they’ll adjust the camera so we can watch as the east gets put together. We are just a couple months out from watching seats get installed and scoreboards.
|
|
|
Post by jp92grad on Sept 26, 2021 11:43:10 GMT -8
I say just bring in some portal potties, couple of kegs, put the grass down and we play on Saturdays and they can work during the week.
Things are LOOOOOOOOking gooooood!
Go Aztecs!
|
|
|
Post by Old School on Sept 26, 2021 12:02:50 GMT -8
Oldie Out
|
|
|
Post by redaztec5150 on Sept 26, 2021 19:07:16 GMT -8
Latest progress video of the stadium.
|
|
|
Post by Old School on Sept 26, 2021 21:10:08 GMT -8
Oldie Out
|
|
|
Post by aztecfred on Sept 27, 2021 18:06:02 GMT -8
If they are working tonight, must be a late start. The lights are on but, nobody home.
|
|
|
Post by aztecfred on Sept 27, 2021 18:09:42 GMT -8
If they are working tonight, must be a late start. The lights are on but, nobody home. I stand corrected, crane moving!
|
|